New Continuous Galvanizing Plant - 1996
Engineering assistance to expedite completion of electrical power and control system. Coordination of substation design, installation and energization with the power company.
Review of procedure and witness of process control system test at the factory
Preparation of overall installation, checkout and startup plan for the new facility.
Supervision of all installation including mechanical equipment, piping, and electrical.
Complete supervision of all personnel to checkout, cold run, and hot commission the galvanizing line. Directed all Electrical and Automation activities to successfully complete the commissioning one month ahead of schedule with a minimum amount of premium time.
The production startup curve exceeded owner expectations with salable product being produced during hot commissioning.