Existing Meltshop - Cooling Water System Upgrade - 2005
Onsite meetings, field measurements and inspection
Evaluation of Electric Arc Furnace and Caster requirements for Contact and Non-Contact Cooling Water
Development of the concept for expanding the existing system to meet the required flow including capacities for the main components
Specification and procurement of bids for the main components including cooling towers and pumps
Installation engineering including layouts and civil, piping and electrical drawings